RECORD MAY
The steel-smelting shop № 1 of OJSC «BMZ» had reached an inaccessible before level as for the steel melting — 164 075 ton. This record exceeds the previous highest index that was achieved in May 2011 on 3000 ton. More...
The steel-smelting shop № 1 of OJSC «BMZ» had reached an inaccessible before level as for the steel melting — 164 075 ton. This record exceeds the previous highest index that was achieved in May 2011 on 3000 ton. More...
Central laboratory of OJSC “BMZ” got an award “For high level of competence”, according to the results of the competition “Competence-2011”, which was held by Belarusian state center of accreditation. More...
It has been confirmed again in the pipe mill that pipe roller men are able to work as per American standards. Recently, the representatives of American Petroleum Institute carried out an inspection audit of quality management system here in accordance with the requirements of API spec Q1 (8th rev.)/ ISO 9001:2008/ISO/TS 29001-2007 and production of seamless pipes in accordance with the requirements of API Spec 5L (44th rev.) and Spec 5CT (9th rev.) with expansion of scope of licenses 5L-0634 (up to the highest grade Х65Q/PSL2) and 5CT-1300 (up to the highest grade N80Q/PSL1). More...
In August 17, 2012 the staff of a mill 150 passed 5 million tons milestone. Such quantity of production has been manufactured for 12 years, since the moment when two lines of mill 320/150 became independent More...
On August 24, 2012 new entry was written in Uniform State Register of juridical persons and individual entrepreneurs concerning state registration of Open Joint Stock Company “Byelorussian steel works – Management Company of “Byelorussian metallurgical company” holding” More...