News

News

Veiws 2417

Audits at BMZ.

February 08, 2011. Within period from 17.01.2011 to 20.01.2011 the representatives of certification authority «TUV NORD Systems» (Germany) carried out the following audits: - re-certification audit of seamless pipes production for compliance with the requirements of Directive 97/23/EC and AD 2000 Merkblatt W0, W4, W13 with scope of application DIN EN 10216-1,2,3,4/ DIN 1629, DIN EN 10208-1,2; Directive (CPD) 89/106/EEC with scope of application DIN EN 10025-2:2005 and Annexes А and В DIN EN 10210-1:2006; DIN EN 10297-1:2003; DIN EN 10255:2007; - inspection audit of steel fiber production for compliance with the requirements of Directive (CPD) 89/106/EEC with scope of application DIN EN 14889-1.


The following plants and department were inspected during the audit: Scrap Yard, Steel Melting Shop No.2, Rolling Mill-850, Pipe Rolling Mill, Wire Plant No.3, Central Laboratory, Technical Control Department, NDT Laboratory, Quality Management Department, Department of Chief Metrology Specialist

Positive results of the audit provide for an opportunity to make deliveries of the products produced by RUE “BMZ”.

Back